27.08.2014 - Vienna, space2move

space2move, Professionistenfeier

The ceremony for craftsmen in block C of the office building space2move in Vienna’s 19th district, organised by general contractor Strabag, took place at the beginning of August 2014 (Blocks A and B had been completed in autumn of 2011).

Professional engineer Mr. Dvorak (Strabag’s divisional head of Construction and Structural Engineering) welcomed the guests at 4 pm and thanked all subcontractors, co-workers, planners and the building-owner for their excellent cooperation. Dr. Pfeffer (RPHI) directed a special word of welcome to the representatives of the tenant, for who the building had been custom-built, and pointed out that the structural work as well as the fit-out had been completed without any accidents and major injuries.

The prospective tenant was represented by Dr. Scheicher (RALT) who especially thanked DI Schmittner (RPHI) for her successful project coordination.

After the short speeches the guests sat down to enjoy an extensive buffet offered by the SV Group.  The very successful feast lasted until after midnight.